“Der Dornhof” Project - Building 4

New office building construction
on Siemensstrasse in Neu-Isenburg



The third construction phase of the “Der Dornhof” complex, G4, is currently in progress and will be completed in Q4 2019.

The building is located on Siemensstraße between buildings G2 and G3 and is distinct in appearance with a lighter façade and colour scheme. Just like its two neighbours, it has five full floors and a mezzanine, as well as a basement-level floor with an underground garage. All floors have balconies or terraces.

The building’s architectural details include an extended ground floor which allows for a range of versatile uses, and a curved shape in harmony with Siemensstraße.

Phase G4 will meet the DGNB Platinum Standard (“Green Building”). The technical features include heated/chilled ceilings (adjustable for each room), raised floors, a minimum of 3.10 m in the offices, CAT-7 cabling and a fibre optic connection, windows that open and exterior sun shades. There are also balconies/terraces on all floors, attractive exterior grounds, and a large number of parking spaces right on the premises. Optimal room depths and a planning grid of 1.35 m ensure very good room efficiency that can meet a variety of preferences for the perfect office arrangement.